00:00:00.000 --> 00:00:02.000
and

00:00:03.000 --> 00:00:05.000
John.

00:00:10.880 --> 00:00:17.719
Show you by our heads. Dear Father God, I pray for the City

00:00:17.719 --> 00:00:22.879
Council meeting tonight. I pray for unity and respect be among

00:00:22.879 --> 00:00:26.879
the members. Father, give every Council member your wisdom and

00:00:26.879 --> 00:00:33.179
as they discussed and passed every item on the agenda tonight.

00:00:33.179 --> 00:00:38.100
I pray that every decision be righteous in your sight for the benefit of the city and

00:00:38.100 --> 00:00:41.100
for your glory only.

00:00:41.100 --> 00:00:44.759
Father bring unity where there might be disunity.

00:00:44.759 --> 00:00:48.599
Father bless each council member's family.

00:00:48.599 --> 00:00:54.359
Help every member to listen well, speak truthfully, and act justly.

00:00:54.359 --> 00:01:17.000
Alderperson, Klemm, Alderperson, Johnson, Simmons, Parker, Stacy, Shadle, Sanders, Sellers,

00:01:17.000 --> 00:01:18.000
We have a quorum.

00:01:18.000 --> 00:01:41.740
If you could please stand for the Pledge of Allegiance led by Alderman Johnson.

00:01:41.740 --> 00:01:43.500
Item number four is the approval of the agenda.

00:01:43.500 --> 00:01:44.500
Is there such a motion?

00:01:44.500 --> 00:01:45.500
So moved.

00:01:45.500 --> 00:01:46.500
Second.

00:01:46.500 --> 00:02:16.500
made by Alderman Shadle, seconded by Alderman Sellers. All those in favor signify by saying aye. Aye. Opposed? That motion passes. Item number five is approval of the minutes from the Committee of the Whole meeting on October 14th, 2025. Is there a motion to approve? So moved. Second. Motion made by Alderman Shadle, seconded by Alderman Sellers. All those in favor signify by saying aye. Aye. Opposed? That motion passes. Darren, can you see if there's any

00:02:16.500 --> 00:02:25.280
sign in for a public comment okay but he'll wait until the next yep I did

00:02:25.280 --> 00:02:31.479
receive one you did just hand them to me yes okay dear council members as the

00:02:31.479 --> 00:02:35.560
city of Freeport's tourism I'll first say it's from Nicole Haas with the Greater

00:02:35.560 --> 00:02:40.120
Freeport Partnership as the city of Freeport's tourism promotion agency the

00:02:40.120 --> 00:02:44.639
Greater Freeport Partnership would like to express our enthusiastic support for

00:02:44.640 --> 00:02:53.160
for establishing a sister city relationship between Freeport, Illinois and Lilditz, Pennsylvania.

00:02:53.160 --> 00:02:59.020
This partnership represents a unique opportunity to celebrate shared heritage, foster cultural

00:02:59.020 --> 00:03:05.880
exchange and strengthen tourism initiative that benefit both communities.

00:03:05.880 --> 00:03:10.920
Freeport and Lidditz share a deep-rooted German heritage which is evident in local traditions,

00:03:10.920 --> 00:03:13.360
architecture and culinary history.

00:03:13.360 --> 00:03:31.800
Freeport cities proudly embrace their connection to the pretzel, a symbol of German culture and craftsmanship. Freeport's legacy as the pretzel city and Lidditz renowned pretzel making tradition create a natural bond that can be showcased through joint festivals and future cross-promotion.

00:03:31.800 --> 00:03:37.800
Beyond pretzels, this sister city designation opens doors to broader tourism opportunities.

00:03:37.800 --> 00:03:45.800
Freeport offers visitors a vibrant mix of attractions, including historic sites, scenic parks, and a thriving arts community.

00:03:45.800 --> 00:03:53.800
Lidditz, celebrated as one of America's most charming small towns, brings its own rich history on cultural vibrancy.

00:03:53.800 --> 00:03:59.800
Together, these destinations can collaborate on marketing campaigns, heritage tourism initiatives,

00:03:59.800 --> 00:04:04.960
and Appeal to Visitors Seeking Authentic Small Town Experiences Steeped in Tradition.

00:04:04.960 --> 00:04:09.560
We believe this partnership will not only honor our shared history, but also create meaningful

00:04:09.560 --> 00:04:13.840
connections that drive tourism potential and economic activity.

00:04:13.840 --> 00:04:18.100
The Greater Freeport Partnership is committed to supporting this initiative and looks forward

00:04:18.100 --> 00:04:20.920
to the exciting possibilities it will bring.

00:04:20.920 --> 00:04:27.319
Thank you, Nicole Haas, Greater Freeport Partnership Marketing and Tourism Director.

00:04:27.319 --> 00:04:28.319
Thank you.

00:04:28.319 --> 00:04:35.719
7 is presentation of potential Sister Pretzel City, Lidditz, Pennsylvania, Tim Connors.

00:04:35.719 --> 00:04:46.800
Hello, everyone. I'm Tim Connors, 2082 Chelsea Avenue, Freeport, Illinois. What Ms. Haas

00:04:46.800 --> 00:04:56.959
just said, I 100% agree with. A while ago I went into an antique store and I saw a pretzel

00:04:56.959 --> 00:05:26.959
Hicks, and I worked on that. I was a pretzel pot holder. And that pretzel pot holder, all kinds of pretzels around it, I turned it over and it said, Liditz, Pennsylvania, home of the pretzels. Now I looked at it and I'm not going to say what I said when I looked at that. I said, that's not the case. We're home of the pretzels. I need to call the mayor. So I contacted the mayor of Liditz, Pennsylvania. His phone number immediately came up on Google. And I chatted with him for four minutes.

00:05:26.959 --> 00:05:28.959
and the rest of the board.

00:05:28.959 --> 00:05:31.959
He's been in the business for 40 minutes.

00:05:31.959 --> 00:05:41.959
With the conversation, he told me that he was in, he owned the oldest commercial bakery in the United States of America.

00:05:41.959 --> 00:05:44.959
And along with that, the Sturgis Bakery Company.

00:05:44.959 --> 00:05:54.959
And his brother-in-law owns the Tom Sturgis Pretzel Company that has been a part of, of Littice, Pennsylvania and around the area,

00:05:54.959 --> 00:06:01.199
as we spoke we talked about how Freeport and Lidditz were so much alike when it

00:06:01.199 --> 00:06:07.000
came to the German heritage to the point that Mayor Snyder said to me when can I

00:06:07.000 --> 00:06:13.639
come up and visit and I said well do you want a big activity and he goes I want a

00:06:13.639 --> 00:06:19.919
big activity I said I it I invite you to Pretzel City Brewfest and he goes can I

00:06:19.920 --> 00:06:20.920
and Mary.

00:06:20.920 --> 00:06:21.920
I come the entire weekend.

00:06:21.920 --> 00:06:28.000
So, basically, what happened was I jumped very high in the air and got an appointment

00:06:28.000 --> 00:06:35.120
with Mayor Miller as quickly as possible and let her know that this was a possibility of

00:06:35.120 --> 00:06:37.680
someone who was quite interested in our town.

00:06:37.680 --> 00:06:44.720
As we spoke, he said, I think we should become Sister Cities and I said, I think so too.

00:06:44.720 --> 00:06:49.879
He's like, let me come in, take some pictures and see what this is all about and see what

00:06:49.879 --> 00:07:19.879
He loved Freeport. He loved Freeport so much from the standpoint that he said this town has so much potential. Now, Lidditz, Pennsylvania is a 9,000 populated borough that is in between Hershey, Pennsylvania and Lancaster, Pennsylvania. What's the largest thing in there? It's a 25,000 soundstage that all of the big concert individuals come in and play.

00:07:19.879 --> 00:07:49.879
Taylor, Taylor Swift, Katy Perry

00:07:49.879 --> 00:07:56.500
What Mayor Snyder did was he put together a PowerPoint that's right here and he basically

00:07:56.500 --> 00:08:02.019
took pictures of us and I always think it's wonderful, I always think it's wonderful when

00:08:02.019 --> 00:08:08.319
someone who doesn't know you or isn't really comfortable with you shows the beauty of the

00:08:08.319 --> 00:08:15.319
The town that you live in, and here's his PowerPoint.

00:08:38.320 --> 00:09:08.320
and he also wanted to be on the big pretzel of our astroturf for the football field but for some reason didn't want a picture I thought it was really it was interesting on Friday I was with him for about five or six hours telling the story of Freeport and showing everything and you saw the picture of the old Van Buren bridge and I thought it was so wonderful that when we walked down to the Van Buren bridge he looked down to his right and he said around the corner

00:09:08.320 --> 00:09:35.320
and I said, you already know our town, Mayor. You already know our town. So they a few weeks ago, he did this presentation and to his board, his city, his city council, his city board, and they all fell in love with us too. And they immediately said, let's create a resolution for us to become sister cities. So now it's our turn.

00:09:35.320 --> 00:09:44.560
Police. So now it's our turn. And I wholeheartedly am excited for the fact that there might be

00:09:44.560 --> 00:09:51.000
new pretzels coming into this town. There might be more tourism coming into this town.

00:09:51.000 --> 00:09:57.040
I've developed a new friend. I'm, my wife and I are going in May to Philadelphia for

00:09:57.039 --> 00:10:00.039
for a couple days and then staying with Mayor Snyder for three days.

00:10:00.039 --> 00:10:04.199
and then staying with Mayor Snyder for three days for Lidditz.

00:10:04.199 --> 00:10:09.159
Along with that, if everything works out here and we have a resolution and we are

00:10:09.159 --> 00:10:13.559
Sister Cities, we're going to have a big Zoom meeting.

00:10:13.559 --> 00:10:16.919
I said a few of us could go down and visit him and he said the weather's too

00:10:16.919 --> 00:10:20.199
bad in in Lidditz during December, so no.

00:10:20.199 --> 00:10:27.480
So we would come together for a group Zoom meeting and basically

00:10:27.480 --> 00:10:34.480
Do you have any questions?

00:10:34.480 --> 00:10:35.480
Yes.

00:10:35.480 --> 00:10:36.480
Cool.

00:10:36.480 --> 00:10:37.480
Thank you.

00:10:37.480 --> 00:10:38.480
Thank you.

00:10:38.480 --> 00:10:39.480
Thank you.

00:10:39.480 --> 00:10:51.480
So, if there's no other discussion, is it agreed upon that we'll move this resolution

00:10:51.480 --> 00:10:54.480
to, I'm guessing, Tim, December 1st?

00:10:54.480 --> 00:11:10.480
Thank you very much. We appreciate it. Item number eight is Discussion of Engineering

00:11:10.480 --> 00:11:15.959
Agreements with Fehr Graham for National Pollutant Discharge Elimination System, Permitting Services

00:11:15.959 --> 00:11:20.679
and Design Engineering for Phase Two of the Wastewater Treatment Plant Upgrades. Manager

00:11:20.679 --> 00:11:28.480
Breuer. Thank you Your Honor. Just moving forward we're in the process of completing

00:11:28.480 --> 00:11:33.519
phase 1 down at the wastewater plant and if you would haven't been there and like

00:11:33.519 --> 00:11:37.500
to go please let me know. I'll be happy to take you. That includes the chemically

00:11:37.500 --> 00:11:42.519
enhanced primary treatment, that handles the inundation of stormwater that comes

00:11:42.519 --> 00:11:46.439
in through the sewer system so that we don't flood out our wastewater plant. It

00:11:46.439 --> 00:11:51.579
It also includes new headworks that'll have grid separation and bar screen that'll be much

00:11:51.579 --> 00:11:55.799
more effective at removing constituents from the waste stream before it gets into our pumping

00:11:55.799 --> 00:11:56.799
equipment.

00:11:56.799 --> 00:11:58.480
We'll also be finite.

00:11:58.480 --> 00:12:03.139
We're working on the lab building and offices at this time, and I think we're very close

00:12:03.139 --> 00:12:08.819
to completing the UV treatment process, which will allow us to get away from chlorine, which

00:12:08.819 --> 00:12:13.699
creates disinfection byproducts that are harmful to aquatic life.

00:12:13.699 --> 00:12:20.000
With that being said, we're moving toward phase two at this time. Phase two is sludge handling.

00:12:20.000 --> 00:12:26.500
We recently submitted and received our national pollution discharge permit that requires us

00:12:26.500 --> 00:12:33.220
to reduce our, what they call, we need to do nutrient removal. That's phosphorus, nitrogen,

00:12:33.220 --> 00:12:38.379
dent type of thing. In order to do that, there'll be more coagulation that goes on at the plant

00:12:38.379 --> 00:12:42.859
and that coagulation will cause solids to drop out in the treatment process and that

00:12:42.859 --> 00:13:12.859
We'll end up in the sludge handling process. It will roughly double our sludge handling needs. So at this point, the next phase is to be upgrading our gravity belt thickener and our other process handling equipment and also our sludge storage area. But this time, that's kind of the high level summary. And at this point, I'd like to turn it over to Darren to kind of go through some of the details. Sure. We put together a small power plant. We put together a small power

00:13:12.859 --> 00:13:42.859
to give us some basis. So Kurt, if you can go to the next slide, please. So phase one is what we're currently constructing. It was approximately $60 million upgrade. It started in 2023. As Rob said, we're working on the Headworks, which is the facility that brings all the waste into the facility and screens it. It does also grid separation, chemically enhanced primary treatment is

00:13:42.859 --> 00:13:49.019
is a facility that handles overruns of the plant, so we no longer discharge directly to the river.

00:13:50.379 --> 00:13:55.659
UV disinfection is a big upgrade at the facility, so we're no longer feeding chlorine, and the goal

00:13:55.659 --> 00:14:02.059
is to have that operational for next spring. And then the lab and administrative building are

00:14:02.059 --> 00:14:09.980
being constructed right now. Phase two, and let me step back for a moment, I just want everybody

00:14:09.980 --> 00:14:15.859
to know this project process has been going on since 2015 is when we started the wastewater

00:14:15.859 --> 00:14:18.299
treatment overhaul.

00:14:18.299 --> 00:14:22.299
There was a two-year planning effort that was put together to lay out the steps and

00:14:22.299 --> 00:14:30.179
stages as USEPA let us know that the affluent discharge limits would be changing in Illinois

00:14:30.179 --> 00:14:38.519
specifically to impaired streamways due to primarily phosphorus and other items within

00:14:38.519 --> 00:15:08.519
and our waystreams. So the three phase approach has been put together. Actually, originally, it was a five phase approach. But with EPA requirements, things had to be advanced. So we are about 12 to 15 months away from completion of phase one. So phase two is the approximately $45 million of construction. We need to start

00:15:08.519 --> 00:15:13.879
Robert, the construction in 2027 in order to meet our discharge limits.

00:15:13.879 --> 00:15:19.680
As Rob stated, it is the sludge handling and digestion portion of the process, which I'll

00:15:19.680 --> 00:15:23.519
get into a little bit more later.

00:15:23.519 --> 00:15:30.159
In order to reduce and remove phosphorus from our waste stream, it will more than double

00:15:30.159 --> 00:15:35.680
our sludge handling efforts that we remove at the wastewater treatment plant every day.

00:15:35.679 --> 00:15:40.319
So, our facilities are not large enough or equipped to handle it.

00:15:40.319 --> 00:15:46.500
It should be known that the last major upgrade at the wastewater treatment facility was done

00:15:46.500 --> 00:15:47.980
in the 70s.

00:15:47.980 --> 00:15:55.839
There was a biological activated filter that was installed around in the 80s to enhance

00:15:55.839 --> 00:15:57.720
ammonia removal.

00:15:57.720 --> 00:16:04.559
But so it's been, you know, many, many years since we've seen upgrades at the plant.

00:16:04.559 --> 00:16:10.240
I've got a map that I'll show you but the site is very tight to work on and there's not a lot of

00:16:10.240 --> 00:16:18.000
space left on it especially since the solar panels were added I believe that was in 2018.

00:16:19.119 --> 00:16:24.799
Phase three is yet to come but is part of the process. Phase three includes primary

00:16:24.799 --> 00:16:31.439
filtration systems which will enhance the phosphorus removal but phase three and two

00:16:31.440 --> 00:16:39.680
we have strategically split in order to basically go after more forgivable funds from the Illinois EPA

00:16:39.680 --> 00:16:47.200
by splitting the project into two different times. The plan right now is for primary filtration

00:16:47.200 --> 00:16:53.200
to occupy the space that the digesters actually occupy now so until we get that cycle built

00:16:53.839 --> 00:16:58.879
we can't move on to the primary filtration. So Kurt, can you go to the next slide please?

00:16:58.879 --> 00:17:05.880
I forgot to mention, right now it's thought that Phase 3 construction will be around $25 million.

00:17:05.880 --> 00:17:12.880
To give you some history of the NPDS permit, so it's the National Pollutant Discharge Elimination Permit.

00:17:12.880 --> 00:17:18.880
It is approved by the Federal EPA and enforced by the Illinois EPA.

00:17:18.880 --> 00:17:24.880
This permit sets the regulations of our discharge to the Pecatonica River.

00:17:24.880 --> 00:17:29.980
River, and without this permit we would actually have to shut the water system off because

00:17:29.980 --> 00:17:32.559
we can't discharge without this permit.

00:17:32.559 --> 00:17:36.139
So it's a very important piece of what we do as a city.

00:17:36.139 --> 00:17:41.639
The city is the primary owner of our collection system for wastewaters and currently in Freeport

00:17:41.639 --> 00:17:48.240
we have segregated systems which means that we don't have stormwater and sewer water combined.

00:17:48.240 --> 00:17:49.599
They're all separated.

00:17:49.599 --> 00:17:54.759
We don't know of any connected points that would be illegal at this point.

00:17:54.759 --> 00:17:59.480
I'm not saying there might not be some that exist currently, but none that we know of

00:17:59.480 --> 00:18:07.039
and we're constantly searching for those annually in the reduction of our I&I efforts.

00:18:07.039 --> 00:18:13.200
The last NPDES permit was just issued October 24th of 25.

00:18:13.200 --> 00:18:18.480
There was a draft permit that was issued and a public notice that went out for any comments.

00:18:18.480 --> 00:18:30.480
In the new permit, it is required that phosphorus will be down to 0.5 mg per liter by January 1, 2030.

00:18:30.480 --> 00:18:35.480
As I stated before, we knew as a city that that requirement was going to come.

00:18:35.480 --> 00:18:40.480
They've been telling us for over 10 years that these requirements would come down.

00:18:40.480 --> 00:18:45.480
Currently we discharge phosphorus at about 2 to 3 mg per liter.

00:18:45.480 --> 00:18:50.039
Leader. So that's just a, you know, more of a trivia question to show what our

00:18:50.039 --> 00:18:56.240
reduction needs to be. Modifications for phosphorus removal in the small footprint

00:18:56.240 --> 00:19:00.559
that we have will be chemical removal. There's also biological removal. It's a

00:19:00.559 --> 00:19:06.680
much larger process and needs a lot more equipment. So the city has the basis to do

00:19:06.680 --> 00:19:14.279
chemical removal. When you do chemical removal, it adds a lot more sludge to

00:19:14.279 --> 00:19:44.279
Waste Stream as we remove the phosphorus in the sludge. And I think we mentioned it before, but it will over double the capacity of our sludge, if not, it might not triple it, but it will definitely be over double of what we create daily. And we're going to have to do more pressing operations and longer. Right now, we only press usually four days a week, we'll probably have to press up to six days a week. Once once we go to phosphorus removal. Concurrently,

00:19:44.279 --> 00:19:50.199
U.S. EPA and Illinois EPA continue to look for other phosphorus reduction methods. Phosphorus

00:19:50.199 --> 00:19:56.440
also comes off of farm fields and other contributories, but we are the main contributor

00:19:56.440 --> 00:19:59.559
to the Pecatonica River from the Freeport waste stream.

00:19:59.559 --> 00:20:01.159
and a river from the Freeport waste stream.

00:20:01.159 --> 00:20:05.200
So we are one that really is being focused on

00:20:05.200 --> 00:20:06.200
for the Peck River.

00:20:07.200 --> 00:20:08.220
Next slide please.

00:20:09.879 --> 00:20:14.879
This is a, in the NPS permit, there is 20 special conditions.

00:20:15.039 --> 00:20:16.720
It's 25 pages.

00:20:16.720 --> 00:20:19.759
Anybody that won't want to see it, you know, you can FOIA.

00:20:19.759 --> 00:20:22.200
It has a lot of special information in it.

00:20:22.200 --> 00:20:25.159
There's two specific items that I wanted to point out

00:20:25.159 --> 00:20:26.879
that we're talking about tonight.

00:20:26.879 --> 00:20:40.879
So, the, excuse me for a second, special condition 20 is the requirement of the phosphorus removal and there was a schedule put in here for phase two.

00:20:40.879 --> 00:20:54.480
This is actually part of the permit and it basically states that we need to get under design and have design completed by June of next year with a bid with a final completion date of June 30th, 2030.

00:20:54.480 --> 00:21:14.839
The reason this is important is in order to meet our sludge removal and our phosphorus removal capacities, we need to get design two underway so we can bid this next fall or summer, excuse me, in order to be able to also construct phase three in time to meet the permit requirements.

00:21:15.679 --> 00:21:21.559
Again, this is a very large process, very large construction and a very small footprint.

00:21:21.559 --> 00:21:35.559
Special Conditions 17 and 18 have also came out in every permit that we're aware of in our class of facility that we have to also monitor our favorite term in Freeport, PFAS.

00:21:35.559 --> 00:21:41.559
That is a new requirement as part of this permit and that's why we brought it up in this discussion.

00:21:41.559 --> 00:21:46.559
So PFAS, obviously we all know that we've been dealing with that on the water side.

00:21:46.559 --> 00:22:16.559
We have to also test out all of our significant industrial users, our landfill, and our regular waste streams to identify where we can reduce and or eliminate phosphorus. And that is a very important part of what we're trying to do with our waste water supply and our waste water supply and our waste water supply and our waste water supply and our waste water supply.

00:22:16.559 --> 00:22:22.799
for the next five years that we have to do that testing, which that ultimately means that

00:22:22.799 --> 00:22:29.240
there will be rule coming down for PFAS reduction within the next permit cycle or the next two

00:22:29.240 --> 00:22:30.679
permit cycles.

00:22:30.679 --> 00:22:35.240
So that's an important constraint that they're putting on everyone.

00:22:35.240 --> 00:22:41.199
Next slide, please.

00:22:41.200 --> 00:22:47.500
I really wanted to just present this slide to discuss that we have been working on this

00:22:47.500 --> 00:22:51.259
project since 2015.

00:22:51.259 --> 00:22:55.420
The plan was approved in 2017 and sent to the EPA.

00:22:55.420 --> 00:22:59.980
They have approved the wastewater upgrades at the facility.

00:22:59.980 --> 00:23:05.500
Again, we went to a three-step process due to some of the changes within the permits

00:23:05.500 --> 00:23:07.019
so we can meet our limits.

00:23:07.019 --> 00:23:18.240
I believe within the permit, it outlines that if we don't meet our permit by 2030, we will be fined for every day that we do we do exceed these limits. So it's very important that we move forward with this.

00:23:20.460 --> 00:23:32.940
Next slide please. So just as a refresher, I wanted to give you a slide of the wastewater treatment plants so we we can all see what we're dealing with here. So this specific facility right there.

00:23:32.940 --> 00:23:41.940
The sludge handling facility, this is where all of our solid waste goes into and is stored before it's scooped up and taken to the field and land applied.

00:23:41.940 --> 00:23:47.940
The two digesters here are really original and integral to the plant.

00:23:47.940 --> 00:23:50.940
Most of the concrete on these structures has failed.

00:23:50.940 --> 00:23:57.940
The methane system that is currently on this plant system, sometimes at night you can go by and see it burning off.

00:23:57.940 --> 00:24:05.740
off, the methane system is worn, we can't even really run any of the boilers or anything

00:24:05.740 --> 00:24:10.799
off the methane system, currently our industrial waste patterns are not strong enough to provide

00:24:10.799 --> 00:24:14.720
enough methane to actually run equipment off of.

00:24:14.720 --> 00:24:22.259
And then phase three, which is getting very tight back here, was made for new clarifiers,

00:24:22.259 --> 00:24:26.399
instead of using the space because it's getting very full of piping and constraints, the new

00:24:26.400 --> 00:24:31.920
New Primary Clarifiers will go in this digestion area once demolition is done.

00:24:31.920 --> 00:24:38.240
Again, right now we're doing the lab building construction, the headworks construction is

00:24:38.240 --> 00:24:41.839
going on right here, and the UV construction is going on back here.

00:24:41.839 --> 00:24:47.139
So the site is completely full, and I just want to point out, these are the solar panels

00:24:47.139 --> 00:24:53.200
that were installed many years ago, and these really border and perimeter the plant, so

00:24:53.200 --> 00:24:55.079
we're kind of running out of room.

00:24:55.079 --> 00:25:11.079
Next slide please. Again, this is just a quick design photo of what's going on at the site currently. I know Brian Bridges put out some videos if you've seen those of the construction. Next slide please.

00:25:11.079 --> 00:25:23.079
Again, this is the Headworks facility that's being built. This elevation down here at the bottom is 55 feet below the ground level. That's how far we have our waste being pumped up into this building.

00:25:23.079 --> 00:25:35.079
and the building. This is a big screening room and this is a grit removal. This is one of the reasons these these projects are so expensive. Next slide please.

00:25:35.079 --> 00:25:49.079
This is the sept. So the sept. I don't know how else to describe this other than it looks like a giant Olympic swimming pool waste is conveyed into this, and it is what they call a short cycle treatment.

00:25:49.079 --> 00:25:54.919
so when we get access flows in Freeport which is our I&I season this facility will allow treatment

00:25:54.919 --> 00:25:59.799
to handle and still meet our affluent requirements. Next slide please.

00:26:03.240 --> 00:26:09.559
This is the UV disinfection building. This will have a UV equipment in it that's redundant that

00:26:09.559 --> 00:26:15.799
will again eliminate our need for chlorine. We will still have a little bit of chlorine in for

00:26:15.799 --> 00:26:20.359
We're cleaning in the plant, but this will eliminate 99% of all chlorine that's being

00:26:20.359 --> 00:26:24.199
discharged to the river as part of our disinfection process.

00:26:24.199 --> 00:26:26.000
Next slide.

00:26:26.000 --> 00:26:30.119
This is the lab building that is just currently starting to go up.

00:26:30.119 --> 00:26:34.119
This will house a new laboratory for all of our wastewater staff that does our testing

00:26:34.119 --> 00:26:38.119
daily and a couple of administration offices.

00:26:38.119 --> 00:26:43.199
A very important building because Freeport saves thousands of dollars, actually more

00:26:43.199 --> 00:26:50.699
More Than Thousands annually by doing as much of the testing as we can with our own staff.

00:26:50.699 --> 00:26:53.179
Next slide, Kurt, thank you.

00:26:53.179 --> 00:27:00.940
So what I want to point out is again, here's the existing sludge handling facilities.

00:27:00.940 --> 00:27:06.219
This will be moving and eliminated in order to move over to this side of the solar panels.

00:27:06.219 --> 00:27:11.179
This is where we're projecting the digester and the sludge handling buildings going in

00:27:11.179 --> 00:27:41.179
and the future. And the pipe conveyance will be along the frontage of the solar panels to get here. This is the only space available left for the size of equipment. And then phase three, you can hardly see it here, it'll be right where the digesters are here. That's where the primary filters will go after they can be demoed. Next slide, Kurt. So I just wanted to give you a quick explanation of the

00:27:41.179 --> 00:28:11.179
So our waste water comes into the plant. There's a lot of fancy equipment that does removal of hard objects, toilet paper, rags, material people flush. And then through that process, it goes into clarifiers. And the clarifiers allow settlement of the waste and skim off, excuse me, scum and oils off the top. And then from that process, it goes into

00:28:11.179 --> 00:28:35.179
and then to our digesters. Through our digesters is where the waste really gets thickened. And heavier solids are provided out and it goes into our dewatering systems which Freeport we call, I call them the pattycake presses. It's a machine driven to actually squeeze the water out of the waste and make it more solid.

00:28:35.179 --> 00:28:38.900
and then, um, then it goes into our drying building at the sludge process.

00:28:39.319 --> 00:28:44.960
And then, um, as, as that's hauled out approximately four times a year to land

00:28:44.960 --> 00:28:49.599
applications, that we have a third party contractor that does the land negotiations

00:28:49.599 --> 00:28:50.920
and the, the sludge spreading.

00:28:51.179 --> 00:28:55.420
Cecelia, I'll remind you that it only goes on animal fields, not human

00:28:55.420 --> 00:28:56.719
consumption fields, right?

00:28:56.719 --> 00:28:58.179
We had that discussion before.

00:28:58.619 --> 00:29:01.920
Um, but that's the process for, for waste.

00:29:02.259 --> 00:29:04.299
Um, it's not unique to Freeport.

00:29:04.299 --> 00:29:17.699
It's the same everywhere we go, and it's the simplified version of what we have going on at our plant. Next slide. So this is a picture of our existing digesters. As you can see,

00:29:20.099 --> 00:29:29.859
much of the concrete is starting to crack and have control joint issues. The equipment that's inside this control room is very aged and old.

00:29:29.860 --> 00:29:34.860
We've had numerous issues and repair problems with these digesters.

00:29:34.860 --> 00:29:36.860
Next slide please.

00:29:36.860 --> 00:29:42.860
This is existing photos of the patty cake presses.

00:29:42.860 --> 00:29:45.860
This is how we dewater and squeeze the solids out.

00:29:45.860 --> 00:29:53.860
This building is very acidic and we've had to go to great lengths to secure this facility.

00:29:53.860 --> 00:29:56.860
As you can see back in the corner here, you can see like we put up tarps.

00:29:56.860 --> 00:29:59.500
They're almost like shower curtains trying to

00:29:59.500 --> 00:30:02.700
They're almost like shower curtains trying to keep the

00:30:02.700 --> 00:30:07.140
acids within the perimeter of where the material is pressed so

00:30:07.140 --> 00:30:10.779
it can go back into our RAS system, which is return

00:30:10.779 --> 00:30:14.079
activated sludge that that squeezed out portion goes back

00:30:14.079 --> 00:30:17.119
into the head of the plant and is returned back for biological

00:30:17.119 --> 00:30:24.619
material to eat and reduce our waste. Next slide, please. This

00:30:24.619 --> 00:30:28.420
is our the interior of the sludge storage building. This is

00:30:28.420 --> 00:30:58.420
This is what we call cake. This is what our sludge turns into within the waste building. There's conveyors that take it out in here. You can kind of see the lines on the walls. This building will fill up probably eight to 10 feet in the air with sludge. We push it in with big wheel loaders. And then when Cinegro, our land applicator comes in, we scoop this out. I believe it's somewhere around 20 semis at a time that are taken out to the field and then land applied. This facility

00:30:58.420 --> 00:31:26.859
is antiquated. It's old new facilities, new technology allows for semi back ends and different kind of a conveyance and new types of structures. This particular facility is looking very worn. As you can see, a lot of the old structure inside has wood, which is not a component that's used anymore in this type of construction due to the acidity and the gases and things that are put off within these buildings. Next slide, please.

00:31:28.420 --> 00:31:32.019
So I wanted to give you a couple examples of other projects that we've done.

00:31:32.339 --> 00:31:35.539
This is actually a new style press system.

00:31:36.579 --> 00:31:38.140
This is a belt system.

00:31:38.140 --> 00:31:41.380
There's different types of systems that can be provided,

00:31:41.579 --> 00:31:45.619
but you can see the difference between the controls, the floor grating,

00:31:45.819 --> 00:31:49.180
things like that, that keep the acidities and also the cleanliness

00:31:49.180 --> 00:31:52.940
of the facility to a steady constant.

00:31:53.140 --> 00:31:56.740
You also see in everything that's done in the wastewater system now,

00:31:56.740 --> 00:32:05.740
It's required that you provide redundancy, so you'll have two of everything. That way, if anything goes down for maintenance or failure, you'll always have a backup to keep running.

00:32:05.740 --> 00:32:08.740
Next slide please.

00:32:08.740 --> 00:32:17.740
This is a picture of another unit that we did with new digesters and a new control building for the sludge handling material.

00:32:17.740 --> 00:32:29.740
This project was done in 2023. It just gives you kind of an idea of the footprint and the magnitude of what new digesters that are the appropriate size would need to be for the City of Freeport.

00:32:29.740 --> 00:32:36.740
The ones that we have currently are very undersized for the amount of waste that we take in.

00:32:36.740 --> 00:32:42.740
And with that, I will take any questions on either one of the proposals.

00:32:42.740 --> 00:32:49.140
again I'd like to state this shouldn't be anything too new to most of you we've

00:32:49.140 --> 00:32:57.740
been working on this project again since really 2017 phase one is I would say

00:32:57.740 --> 00:33:04.339
about 60 65 percent complete with construction I don't know if anybody's

00:33:04.339 --> 00:33:08.779
been by there there currently is probably up to 75 people working there

00:33:08.779 --> 00:33:15.460
Dayley. We've had little issues with the property outside of the contamination

00:33:15.460 --> 00:33:19.220
issues that we ran into. We've had little issues with the project, some,

00:33:19.700 --> 00:33:25.819
some, you know, incurses that you run into with projects of this size, some

00:33:25.819 --> 00:33:31.940
code changes that have been made along the way over a seven year design period

00:33:31.940 --> 00:33:36.519
that we had to update a few things for but but very little problem with that

00:33:36.519 --> 00:33:40.480
Project. I don't know, Rob, did I miss anything?

00:33:43.279 --> 00:33:48.039
I think you pretty well covered everything out there. Oh, one

00:33:48.039 --> 00:33:51.119
point you need to remember too is the sludge handling at this

00:33:51.119 --> 00:33:55.079
point is fully depreciated. The digesters were built in the

00:33:55.079 --> 00:34:00.440
30s. The concrete is basically falling apart. And the

00:34:00.440 --> 00:34:04.720
equipment in the dewatering shed and the dewatering building is

00:34:04.720 --> 00:34:11.119
Very old and is breaking down frequently and the as Darren mentioned the sludge

00:34:11.639 --> 00:34:14.280
Storage building is made of wood, which is a problem

00:34:14.760 --> 00:34:21.000
So even without any requirements from the EPA coming down the pike for phosphorus removal

00:34:21.720 --> 00:34:25.340
It would be necessary to replace these structures

00:34:26.000 --> 00:34:30.800
Very soon if not in the kind of similar timeline. So yeah

00:34:30.800 --> 00:34:38.639
One other, I guess, thought or statement that I'll throw out is this is not unique to Freeport.

00:34:39.679 --> 00:34:46.639
Many communities our size and greater are going through this. The tough problem for this type of

00:34:46.639 --> 00:34:52.320
project is, I'll give you the comparison, just Rockford to Freeport, right? Rockford has to

00:34:52.320 --> 00:34:57.199
have the same treatment plant that we have to have here to treat our waste. They have a lot more

00:34:57.199 --> 00:35:27.199
and more people there to pay for it. It's a bigger plant, a bigger size, but they get to share the cost amongst more people. So your DNA is how many people you have in your city. Your waste streams are similar. The equipment is similar for all this. Most of the equipment that is at our plant now, with the exception of the things that have been constructed, is fully depreciated. You guys see that coming through with emergency repairs and pumps and things continuously throughout the process. The waste stream is a 24-7 business.

00:35:27.199 --> 00:35:35.199
in this town. It never goes away and it never stops. We have operators that run 24-7 there,

00:35:35.199 --> 00:35:41.679
seven days a week. This is not something that we can run from and the permit requirements are very

00:35:41.679 --> 00:35:49.840
solid now about what needs to happen and there's several facilities just in our local northern

00:35:49.840 --> 00:36:14.519
Fripport has been ranked as one of the top projects on that list to be done because they

00:36:14.519 --> 00:36:19.239
know the gravity of what we're facing here with the permit limits.

00:36:19.239 --> 00:36:25.780
Thank you. Don, could you turn the lights back on? Any discussion on these updates? Alderman

00:36:25.780 --> 00:36:29.079
Sellers? Yes, I'd just like to know what is the total

00:36:29.079 --> 00:36:35.539
amount that you said that the sludge, this new thing that's coming from the EPA, how

00:36:35.539 --> 00:36:40.880
much is just that costing? I know we have to do all the building work and all that,

00:36:40.880 --> 00:36:46.119
but all this new... Oh, I'm sorry, the PFAS testing?

00:36:46.119 --> 00:36:51.119
Yes. You said every every city has to do this with their water plants.

00:36:51.119 --> 00:36:56.159
Everybody that's getting an NPS permit like us will have to do the PFAS testing.

00:36:56.159 --> 00:37:01.840
It's it's we haven't seen a permit that was issued that doesn't have it in it now.

00:37:01.840 --> 00:37:06.440
What we're going to do is we're going to do we call it a cost share project with the city.

00:37:06.440 --> 00:37:13.559
So the city is going to do the sampling themselves through the labs and their operators and get the results.

00:37:13.559 --> 00:37:17.679
and then Fehr Graham is going to have our engineers write all the reports and their reduction

00:37:17.679 --> 00:37:23.880
plans. So that cost is going to be $41,000. I just got that completed today. And that's

00:37:23.880 --> 00:37:28.800
one of the work orders that will be coming forward. And then the design of the wastewater

00:37:28.800 --> 00:37:34.720
treatment plant facility, I'm waiting on one of the partners to come back to MEP to get

00:37:34.720 --> 00:37:39.720
their final number, but it'll be approximately it'll be just under $3 million for that design

00:37:39.720 --> 00:37:41.559
portion of the 45 million.

00:37:41.559 --> 00:37:43.000
Okay, one more question.

00:37:43.000 --> 00:37:44.119
Alderman Sellers?

00:37:44.119 --> 00:37:47.199
And so with that, so are you saying that

00:37:48.599 --> 00:37:53.599
we are going to have to come up with the 45 million,

00:37:55.679 --> 00:37:59.960
or you're looking for grants and you're pretty sure

00:37:59.960 --> 00:38:03.800
that we're gonna be able to get some of this refunded

00:38:03.800 --> 00:38:06.800
kinda through some of these grants that are already,

00:38:06.800 --> 00:38:09.280
you're already out there looking for, correct?

00:38:09.280 --> 00:38:39.279
So on the 45, the phase two only project, we are confident, can't guarantee anything, but we're confident that we'll qualify for $5 million in forgiveness on that. Rob and I have made a commitment to try to chase other funding for that project. I'm not going to lie to you. I don't know where that's coming from right now. I don't know of any program out there or any other opportunity at this moment to chase funding for the wastewater treatment plant. Part of that process, Alderwomans are

00:38:39.279 --> 00:38:44.639
and others is that the EPA gave all of these cities plenty of notice that these requirements

00:38:44.639 --> 00:38:49.159
were coming down the line and, you know, due to the age of the facilities.

00:38:49.159 --> 00:38:56.720
So that's where planning and utility costs and user rates, that's where that kind of

00:38:56.720 --> 00:38:58.039
is developed on this.

00:38:58.039 --> 00:39:03.099
So our intent on all three of the phases from the original start, because we know the city

00:39:03.099 --> 00:39:14.220
can't flow the cash to fund all this, is to go through the revolving state process, which we have done for many of the large projects. We qualify for some

00:39:14.220 --> 00:39:24.980
forgivable funds. We also plan to contact our congressional direct people to see if there's any funding available that direction. But the bearer

00:39:24.980 --> 00:39:31.139
of a lot of this is going to end up being user rates for the utility because that's how these projects work.

00:39:33.099 --> 00:39:44.099
Any other discussion? Thank you, Darren. We will move on to public comment. Is there any public comment this evening?

00:39:52.099 --> 00:39:58.099
Hi, my name is Cheryl Alderman. The first time there's public comment, there's not much on here to even speak about.

00:39:58.099 --> 00:40:01.199
speak about, I mean, face it.

00:40:01.199 --> 00:40:05.299
Second of all, we're talking about the partnership

00:40:05.299 --> 00:40:06.699
with the other Pennsylvania.

00:40:06.699 --> 00:40:07.539
That's super.

00:40:08.819 --> 00:40:12.500
But if they really saw how bad the crime in this town was,

00:40:12.500 --> 00:40:13.500
I think they'd run.

00:40:14.779 --> 00:40:17.500
Nobody here wants to face the crime.

00:40:17.500 --> 00:40:20.539
There's nothing even on here about the crime.

00:40:20.539 --> 00:40:23.839
I mean, let's face it, the crime's worse in this town.

00:40:25.460 --> 00:40:27.159
It was never like this before.

00:40:28.099 --> 00:40:51.099
Also, second thing, why is Pete Elber still down that building? He's now using taxpayers' money. He was supposed to be out at the end of September. It's way past that. Why is he still here? Why haven't you guys made any attempt to kick him out? He's using, getting it for free now.

00:40:51.099 --> 00:40:57.839
and Rob. I'm still waiting for all that paperwork that was promised to me. The one paperwork

00:40:57.839 --> 00:41:04.339
that you supposedly sent me, it was dated on the 9th, but then you caught that you didn't

00:41:04.339 --> 00:41:09.659
put that paperwork up until the 13th on my building. So you tried to cross out that 9

00:41:09.659 --> 00:41:18.460
and put a 13 there and then head upstairs, you know, notarize it. You're wrong. And I

00:41:18.460 --> 00:41:29.659
still haven't heard anything about Albers. Why were they there? They weren't certified by the state of Illinois to be tearing this building down. No action has been done against them yet. But there will be.

00:41:32.299 --> 00:41:35.179
Any other public comments this evening? Yes.

00:41:37.619 --> 00:41:46.259
Good evening, Council and members of the public. Before we close tonight's meeting, I would just like to take a brief moment to recognize a very special occasion that takes place today.

00:41:46.259 --> 00:41:50.259
the 250th birthday of the United States Marine Corps.

00:41:50.259 --> 00:41:58.259
Before our nation even declared its independence, a small group of men gathered in Philadelphia and formed a corps of Marines.

00:41:58.259 --> 00:42:04.259
From that day forward, the story of the Marines has been tied to the story of America itself.

00:42:04.259 --> 00:42:15.259
250 years later, Marines remain ready to fight, ready to win, and ready to uphold the trusted places in this country since 1775.

00:42:15.259 --> 00:42:21.539
75. To mark this milestone, I would like to share the official 250th birthday message from

00:42:21.539 --> 00:42:28.139
General Eric M. Smith, the Commandant of the Marine Corps. 250 years ago, before our nation

00:42:28.139 --> 00:42:33.059
declared its independence, a small group of men gathered in Philadelphia formed a Corps

00:42:33.059 --> 00:42:40.259
of Marines. From that moment, our story has bound to the story of America itself a quarter

00:42:40.259 --> 00:42:46.099
of a Millennium Later. Marines remain at the center of our nation's defense, ready to fight,

00:42:46.099 --> 00:42:52.739
ready to win, and ready to uphold the trust placed in us in 1775. According to centuries,

00:42:52.739 --> 00:42:57.460
across centuries, Marines have fought on distant shores and in desperate battles,

00:42:57.460 --> 00:43:03.619
earning a reputation for discipline, toughness, and valor. From the Revolution to the World Wars,

00:43:03.619 --> 00:43:09.460
from Chopultepec to today's operations across the globe, every generation has proven worthy

00:43:09.460 --> 00:43:14.579
of the Title Marine. They secured liberty, defended allies and carried forward the promise

00:43:14.579 --> 00:43:20.900
of a free nation and a free world. We are their heirs of that legacy and we are its stewards.

00:43:20.900 --> 00:43:27.299
This anniversary reminds us that our standards are the foundation of the Marine Corps. Honor,

00:43:27.299 --> 00:43:32.980
courage, commitment are not abstractions, but the code that binds us to one another

00:43:32.980 --> 00:43:39.219
and to all who went before. Every Marine, every climb and place must hold true to these values.

00:43:39.219 --> 00:43:45.219
The conflicts ahead will demand nothing less. I cannot be prouder of the Marines I see serving

00:43:45.219 --> 00:43:51.380
today, at home and at sea and across the globe. You carry forward our proud tradition with skill

00:43:51.380 --> 00:43:57.139
and ferocity. It is your disciplined initiative and fighting spirit that anchors our Corps.

00:43:57.139 --> 00:44:03.059
The battles of the next 250 years will be a challenge to us in new ways, but I have no doubt

00:44:03.059 --> 00:44:07.059
We will prevail. Happy birthday, Marines. Thank you, Your Honor.

00:44:07.059 --> 00:44:11.059
Thank you. With that, I will entertain a motion for adjournment.

00:44:11.059 --> 00:44:15.059
So moved. Second. Motion made by Alderman Sellers, seconded by Alderman Shadle.

00:44:15.059 --> 00:44:19.059
All those in favor, signify by saying aye.